2011 Cleanup from the Air

In April 2015 I was using Google Maps and discovered that the last aerial shots of the Bryant Mill site were taken while the final cleanup was ongoing in 2011. Here is the entire construction site

 

Here's a close-up of the construction site in five screen captures from the Google site.

 

These are the remnants of the two Mill D platforms over Portage Creek. Note the creek has been temporarily diverted around them.

Here are the remains of the Mill E platform over Portage Creek. Most of the Mill E creek bypass around the platform can no longer be seen. The Bryant St bridge is still in place but not for much longer.

Return to the 2011 Cleanup links page

Return to Main Page

Last Edited by JMW 04/10/15